Experiment 1 - DATUM

Experiment 1 - Datum







Prior to beggining of ARCH1101 - Homework

This was my HSC Major project for Design & Technology.
It is a water cleaning system that utilises natural resources to purify water for consumption.

This is the Leaning Tower of Piza which is located in Piza, Italy. Construction of this architectural started in 1173 and finished in 1372. It leans because the foundation it was built on was soft. I'm surprised it hasn't fallen yet.
This picture is a beautiful photograph of Leon the Labrador. He doesn't bite :)
Automobile, Stationary, Dull.
      noun,       verb,     adjective
Glass, See-Through, Fragile
 noun,       verb,     adjective


Free, Liberation, Afraid
 noun,       verb,     adjective

Week 1 ARCH 1101 - 18 Sections








Image of Draft Sketch-Up 1






The main materials that I'll be choosing for my final design will be:
- glass, wood, stone, cement, tiles

Image of Draft Sketch-Up 2

















The main materials that I'll be choosing for my final design will be:
- glass, wood, stone, cement, tiles

Week 2 ARCH 1101 - Stairs


This scene in Harry Potter has always intrigued me. I used it and developed two sets of stairs were it has the modern look and mobility as seen in the video. My above ground stairs have the modern appearance to it while my below ground stairs have the mobile look to it due to its spiral twist.


Below ground stairs
Above ground stairs

































Week 3 ARCH 1101 - Textures



Each column is one page. (Three words left side, three words right side)






































Week 4 ARCH1101 - Animation













Comments

Popular posts from this blog

Experiment 2 - The Space Between

Experiment 3 - The Bridge